At C. M. Pancho
Construction, Inc., we have taken quality, health and
safety and environment to greater heights by building our reputation on
it. With four decades of history, the company today is breaking new
ground as it continuously revitalizes its operations in sync with an
evolving world we are living in truly remarkable times and we’re proud
that in a constantly changing industry, our company has repeatedly
demonstrated its ability to adapt and meet these changes.
Excavation
Works
Installation of discharge pipe at
Bit-Os Pumping Station
Launching of
girder
To solve the perennial problem of settling a bridge's approach, our
engineers drove steel H-piles with structural concrete as girder. This
was attached to the bridge by means of a cable restrainer before the
approach slab was placed.
C. M.
PANCHO CONSTRUCTION, INC. is the only outfit that has a
track record of jacking more than 10 bridges. In this type of difficult
work, our engineers raised the bridges span by depending on the defects
found in the bridge. Our jacking equipment was used to replace the
bearing pad, realign the rocker bearing and also realign bridges as the
case maybe.